The Buildings

The building management team are onsite from Monday to Friday 8:00 to 18:00 and outside of manned reception hours there is security cover 7 days per week from 18:00 until 08:00.

The onsite management team are dedicated to serving the occupiers and carry out a very wide range of services, some of which are listed on the right:

On site amenities

Bear Market coffee, sandwiches and pastries

ELECTRIC CAR

Toyota electric car for the use of tenants in Custom House Plaza

FOOD

CHQ - Variety of food offerings 

Harbourmaster Pub & Restaurant

(both 4 minutes walk) 

Specification

  • Raised access floors
  • Carpeted finish to office floors
  • Stair wells are a mix of carpet and vinyl, toilet areas have ceramic tiles
  • Walls have a plaster skim and painted finish
  • Joinery comprises timber skirtings and doors are generally veneered solid core units
  • Heating to the building is provided by means of a low temperature hot water (LTHW) system
  • Perimeter fan coil units or replaced ceiling mounted 2 pipe refrigerant system with condenser on roof
  • Comfort cooling / air conditioning is provided to the office areas by means of a chilled water system
  • Metered natural gas which feeds the landlords heating plant
  • 3-phase low voltage (LV) electrical supply

Medical Planning Permission

Planning was granted on 15 July 2024 for change of use from office to medical for Level 3 and Level 5 in 3 CHP. Permission for the medical use still stands and is available for use when required. The existing use is office but at any stage within 5 years of the final grant the medical planning grant can be implemented for medical use.

Alternatively, the office use can be retained.

BER Pathway

Please see the BER pathway reports for 3 and 5 CHP in the data room.

The most recent refurbishments improved BER to a B1.